PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

what else must the administrator take into consideration when creating the new LPARs?

An administrator is creating several LPARs on a new Power Systems server. The administrator
knows that Live Partition Mobility (LPM) will be used to distribute the workload between this new
machine and several others in the environment. In addition to ensuring all storage is allocated
through Virtual IO servers, what else must the administrator take into consideration when creating
the new LPARs?

What should be done to maximize the batch performance?

An administrator is designing a new system for their existing batch environment. The current
system is a POWER5 570 with 16 cores and 128GB of RAM with a single LPAR running AIX 5.3.
It takes 12 hours to run their large batch job which is heavily CPU bound on 4 the available CPUs.
The new system will be a Power 770 with 16 cores, 128GB of RAM and the LPAR will run AIX
6.1.What should be done to maximize the batch performance?

what is the most likely cause for this error?

An administrator uses DLPAR on an active LPAR to add an additional VLAN ID into an existing
virtual adapter used by the SEA. The operation fails with error HSC01221 stating that the
Modification of Virtual I/O resources failed. The server being modified is a POWER6 595 running
firmware version EH350_071. The VIO Server is at version 2.2.0.10 FP24Based on this
information, what is the most likely cause for this error?


Page 960 of 1,258« First...102030...958959960961962...970980990...Last »