What is the best way to do this?
The customer has created a 100GB, 250GB, 300GB, 10GB and a 500GB Logical Drives. The
customer has 100GB of free space remaining within that array group. The customer has deleted
the 300GB Logical Drive. They now want to create a 350GB Logical Drive. What is the best way to
do this?
which two items are NOT required to send to the remote site?
When planning for disaster recovery, which two items are NOT required to send to the remote
site? (Choose two.)
What is the lowest cost solution for these requirements?
A customer requires a tier 2 storage solution with a minimum of 10 TB of online storage. What is
the lowest cost solution for these requirements?
Which tool would you consider using to size the appropriate configuration of the new system?
A customer is consolidating two DS4500’s to one new DS5000 family member. Which tool would
you consider using to size the appropriate configuration of the new system?
Which two parameters would reduce the impact of availability from a REORG with SHRLEVEL CHANGE for a partition
Which two parameters would reduce the impact of availability from a REORG with SHRLEVEL
CHANGE for a partitioned table space with 16 parts? (Choose two.)
Which of the below documents should be reviewed for compatibility of this solution?
A customer would like to connect a DS5300 to a System x server running Windows 2008. Which
of the below documents should be reviewed for compatibility of this solution?
What happens if you cable a 2Gb/s expansion module and a 4Gb/s expansion module on the same drive channel on a
What happens if you cable a 2Gb/s expansion module and a 4Gb/s expansion module on the
same drive channel on a DS4800?
what is a key component of the application coding?
The application will be handling a large volume of input data that will need to be added to or
update 4 different tables. On average, there will be 50 million input records daily. To ensure that
the application process to SQL INSERT and SQL UPDATE(or SQL MERGE) delivers a high level
of availability to the tables involved in this application process, what is a key component of the
application coding?
What is the maximum number of fibre channel host ports available on the DS5300?
What is the maximum number of fibre channel host ports available on the DS5300?
What is a possible cause of this message?
If the Recovery Guru indicates ogical Drive not on preferred path? What is a possible cause of this
message?