Which of the following is the correct course of action at the least cost?

A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and
utilizing Power HA to a POWER6 2-core server as their backup machine.
The production machine also has unlimited users, IBM i Access users, SOL, and ILE Compilers.
They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i
and one licensed Power HA core.
The customer wants the backup server to have the same capacity as the production server so it
can be a true high availability server.
Which of the following is the correct course of action at the least cost?

Which solution satisfies the customer’s requirements?

A customer will be consolidating a number of IBM i and AIX partitions from several older servers
onto an existing S824 These partitions are parts of various operating groups within the customer
and require connectivity to various private networks and network redundancy. The server utilizes
SAN Storage and dual VIO Server partitions.
Which solution satisfies the customer’s requirements?