What are two considerations when configuring two Hub Tivoli Enterprise Monitoring Servers (TEMS) for Hot Stand
What are two considerations when configuring two Hub Tivoli Enterprise Monitoring Servers
(TEMS) for Hot Standby? (Choose two.)
How is IBM Tivoli Composite Application Manager for Application Diagnostics V7.1 (ITCAM for AD) application su
How is IBM Tivoli Composite Application Manager for Application Diagnostics V7.1 (ITCAM for AD)
application support installed on a UNIX/Linux server?
What can be defined on a work order?
What can be defined on a work order?
Which two settings disable the ability to view jobs in the plan?
A user without specific IBM Tivoli Workload Scheduler V8.6 privileges can view all of the jobs in the
production plan using the Dynamic Workload Console or conman. Which two settings disable the
ability to view jobs in the plan? (Choose two.)
What should be documented and provided to the customer?
A customer’s backup Window is not finishing on time. Upon reviewing the IBM Tivoli Storage
Manager (TSM) server and client logs it appears that everything is configured properly. The
customer is using eight LT04 tape drives, six LT05 tape drives, one dual port 2GB HBA and two
GigE NIC cards. What should be documented and provided to the customer?
How is an Oracle database backed up consistently with IBM Tivoli Storage Manager V6.2 (TSM) when Oracle Recove
How is an Oracle database backed up consistently with IBM Tivoli Storage Manager V6.2 (TSM) when
Oracle Recovery Manager (RMAN) is not available?
which directory will the rmstdiist utility command remove old files when run on an IBM Tivoli Workload Schedul
From which directory will the rmstdiist utility command remove old files when run on an IBM Tivoli
Workload Scheduler V8.6 master domain manager?
which three databases can be specified for the Tivoli Data Warehouse?
When configuring the Summarization and Pruning Agent, which three databases can be
specified for the Tivoli Data Warehouse? (Choose three.)
Where in the Project Overview document is the description of the solution to achieve this?
The customer has set new requirements for the Recovery Time Objective and Recovery Point
Objective of the IT department. IBM created a proposal which includes hardware and software.
Where in the Project Overview document is the description of the solution to achieve this?
What must be done if the event rule cannot be modified because it is locked by a user?
An event rule already exists and Dynamic Workload Console (DWC) or composer is being used. What
must be done if the event rule cannot be modified because it is locked by a user?