Which of the following will cause Live Partition Mobility validation to fail?
Which of the following will cause Live Partition Mobility validation to fail?
What component needs to be included for this solution to function?
A prospect is considering a Flex System solution that has one p260 node and four x240 nodes.
Virtualization hypervisors will be deployed on all five nodes. What component needs to be
included for this solution to function?
Which advantage of PowerVM over VMware will most benefit their environment?
A customer is interested in virtualizing their environment. PowerVM and VMware are the products whose
hypervisors are best suited for their existing infrastructure. Which advantage of PowerVM over VMware will
most benefit their environment?
Which of the following is the minimum percentage of a core needed to define an LPAR in a PureFlex POWER7+ comp
A PureFlex Express prospect has a need for several very small partitions. Which of the following is
the minimum percentage of a core needed to define an LPAR in a PureFlex POWER7+ compute
node using PowerVM?
Which of the following Storwize V7000 advanced functions allows for the retention of both the image mode…
Which of the following Storwize V7000 advanced functions allows for the retention of both the
image mode and managed mode disks during migration, and provides seamless fail over in the
event of a failure after the migration?
Which is one of the advantages of the 6-core Power 720 when compared to the 4-core Power 720?
Which is one of the advantages of the 6-core Power 720 when compared to the 4-core Power 720?
Which of the following is an IBM requirement for the technical specialist?
A technical specialist needs to identify and reduce the risk for a new PureFlex foundation
implementation Which of the following is an IBM requirement for the technical specialist?
Which of the following solutions should be presented to the customer for consideration?
A customer plans to deploy a 24×7 application, and is evaluating prospective solutions based on which would
offer the highest level of application availability. Which of the following solutions should be presented to the
customer for consideration?
Which of the following attributes would make an IBM PureFlex solution attractive over IBM BladeCenter?
A customer is contemplating two POWER-based solutions to run a compute intensive application.
One option using IBM BladeCenter PS704 blades and another using IBM PureFlex p460 Compute
Nodes. Which of the following attributes would make an IBM PureFlex solution attractive over IBM
BladeCenter?
Which system is the minimum needed to support the customer requirements?
A customer wants to implement 8 LPARs, 4 of IBM i and 4 of AIX. The customer wants the new systems to be
modular, configured to support their needs, and have room to expand if needed. Which system is the minimum
needed to support the customer requirements?