PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

What method is best employed to achieve this with the least impact on the batch run, and at the lowest cost?

A customer has two TS7740 V07 at Release 3 in a two-way grid across two sites. There is a new
requirement for a subset of the data created in Site A (Cluster 0) to be written in both sites but to
be in Site B (Cluster 1) at the end of the job.
What method is best employed to achieve this with the least impact on the batch run, and at the
lowest cost?