PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

which of the following is one step that must be taken?

In a TS7740 two-way grid Cluster 0 is the production site and Cluster I is the remote DR site. The scratch
volume category for the production site is 0012 andDR site’s scratch volume category is 0022. Before a DR
test is started, several DR system updates must be in place to protect the production scratch volumes from
being allocated during the test.
Assuming Selective Write Protect is enabled, which of the following is one step that must be taken?