Which three tasks does the installer need to complete to solve this problem?

A customer needs to add an EF280 with FC into its existing Brocade fabric but the FC ports in the SANtricity System Manager are showing the FC ports as down and the LED on the FC HIC is amber.

Which three tasks does the installer need to complete to solve this problem? (Choose three.)

A. Verify that the ports are enabled on the switch

B. Verify that the cables are plugged into the switch

C. Verify that the server HBA has the boot BIOS enabled
D. Verify that the EF280s management port is up

E. Verify that the switch zone has the WWPNs for the EF280 and Server HBAs