The EMC account team has been asked to design a NetWorker backup solution with the following
requirements.
1. One copy of backup data needs to be stored locally.
2. An additional copy of backup data needs to be stored on tape at an offsite location.
What should be done to satisfy the new regulations with minimal impact to the current backup
performance?

A.
Clone to tape and send the clone copy to the remote location
B.
Back up the data concurrently to the remote and local locations
C.
Archive the backup data to the remote location
D.
Archive the data to the remote location before being backed up locally
How can this be achived with Networker ? I think cloning and sending the tape offsite is a more appropriate answer.
0
0