A customer has ordered a two-engine VPLEX cluster to be installed in a custom rack. A minimal VNX5300 is
already installed in the middle of the rack, occupying nine rack unit spaces.
What is the correct approach to deploy the two-engine VPLEX cluster?

PrepAway - Latest Free Exam Questions & Answers

A.
The engines and SPSs can be placed under the VNX5300 and the other components above the VNX5300
using longer cables.

B.
Use a rack with sufficient space to install all the VPLEX cluster components together according to the
predefined EMC layout.

C.
The installation of a two engine cluster is not supported in a customer rack without a formal EMC RPQ.

D.
The EMC account team must order a factory installed VPLEX two engine configuration and ship the custom
install VPLEX back to EMC.