Scenario: A network engineer deployed a new NetScaler MPX appliance on the network
and all interfaces are connected to the core switch. The network engineer notices the CPU
utilization has become very high on the switch since the NetScaler deployment. Which two
actions could the engineer perform on the NetScaler to resolve this issue? (Choose two.)

A.
Configure VMAC
B.
Utilize static routing
C.
Configure a channel
D.
Connect a single interface only
Answer is C and D
0
0