How should you proceed?
You have a client that would like to upgrade their 2.4‐GHz point‐to‐point wireless bridge link
between buildings in their facility in Mexico. Currently, they have radios from vendor A that are
transmitting at 14 dBm with 6 dBm antennas. They would like to upgrade the radios to vendor B but
keep the existing antennas. The new radios from vendor B have a fixed transmit power of 7 dBm.
How should you proceed?
you need to consider prior to performing the site survey for this bridge link? (Choose three.)
You have a customer that operates a large open pit coal mine in the western United States. They
need to deploy a wireless point‐to‐point bridge link across the mine. The distance of the link is 1.5
miles. Which three things do you need to consider prior to performing the site survey for this bridge
link? (Choose three.)
Which three types of infrastructure issues need to be verified prior to performing a wireless site survey?
Which three types of infrastructure issues need to be verified prior to performing a wireless site
survey? (Choose three.)
you need to consider prior to performing a wireless site survey? (Choose three.)
Which three things do you need to consider prior to performing a wireless site survey? (Choose
three.)
Which infrastructure issue needs to be verified and potentially resolved before deploying a centralized 802.11
Which infrastructure issue needs to be verified and potentially resolved before deploying a
centralized 802.11n WLAN?
What could be causing the issue?
which two tools will be important to have when performing a WLAN site survey?
Aside from software applications, which two tools will be important to have when performing a
WLAN site survey? (Choose two.)
you need to perform a WLAN site survey? (Choose three.)
Which three basic pieces of information will you need to perform a WLAN site survey? (Choose
three.)
you need to know about the scope of the project before starting? (Choose four.)
When discussing a WLAN site survey project with a customer, which four things do you need to
know about the scope of the project before starting? (Choose four.)
What type of RF issues do you expect to see while performing the site survey?
You have a customer that is renovating a historic building for a new headquarters. The building was
once an old manufacturing plant. It is constructed of brick with heavy timber beams. What type of
RF issues do you expect to see while performing the site survey?