Going from Level 2 to Level 4 in the work breakdown structure will result in

Going from Level 2 to Level 4 in the work breakdown structure will result in

A.
None of the other alternatives apply

B.
A greater likelihood that something will fall through the cracks

C.
Less estimating accuracy

D.
Lower status reporting costs

E.
Better control of the project