PrepAway - Latest Free Exam Questions & Answers

Which incorrect module configuration can satisfy the customer’s future expansion plans?

You are planning an HP BladeSystem solution on a c7000 enclosure. In addition to the
connectivity requirements shown in the picture. The customer wants to be able to configure
additional network connections with a speed of 2×10 GB LACP for each A5820 switch.
Which incorrect module configuration can satisfy the customer’s future expansion plans?

PrepAway - Latest Free Exam Questions & Answers

A.
Procurve 5120G/XG modules in increment bays 1, 2, 5 and 6 Brocade 8 GB SAN switches in
bays 3 and 4

B.
Virtual Connect Flex 10 modules in increment bays 1 and 2 and virtual connect 8 GB Fibre
Channel modules in bays 3 and 4

C.
Procurve 5120G/XG modules in increment bays 1 and 2 and Brocades 8 GB SAN switches in
bays 3 and 4

D.
Virtual Connect FlexFabric modules in increment bays 1, 2, 3, and 4

Explanation:


Leave a Reply