What is the first configuration step when installing a P4800, which is completely racked and cabled at the fac

You are at customer’s site. What is the first configuration step when installing a P4800, which is
completely racked and cabled at the factory?

PrepAway - Latest Free Exam Questions & Answers

A.
Connect to OA to configure the enclosure components

B.
Configure the Flex10 modules

C.
Connect OA and the Flex10 switch into the management network

D.
Zone MDS600 disk storage to the blades

Explanation:

Page 1 –
http://bizsupport1.austin.hp.com/bc/docs/support/SupportManual/c03041807/c03041807.pdf