Cluster planning involves hardware and software configuration to prevent single points of failure.
What are accepted High Availability solutions? (Select two.)

A.
UPS with 10KA surplus amp power
B.
RAID 0 root device with RAID 5 data drives
C.
RAID 1 root device with RAID 5 data drives
D.
HP 9000 Superdome with 8 CPU cell boards (64 CPUs) and hot swappable redundant Fiber
RAID controllers
E.
two HP 9000 Superdomes with 2 CPU cell boards (2 CPUs) and hot swappable redundant
Fiber RAID controllers