What is the best solution?
A customer bought 30 ProLiant DL360p Gen8 with 750 watt Platinum Power Supplies. Due to
space restrictions, this configuration needs to be installed in the smallest possible footprint. The
maximum estimated heatload will be 22.5KW. The data center is designated for a maximum load
of 8 KW per rack.
What is the best solution?
Which interconnect configuration can you use to satisfy the customer’s requirements?
Which tool can be used to make a quick calculation of these requirements?
During the planning phase of a new BladeSystem Environment, you are asked by the customers’
data center team about the weight, power, and cooling requirements. Which tool can be used to
make a quick calculation of these requirements?
Which HP Solution allows a seamless transaction of the operating system and application to the new hardware wi
Your customer is using a medical application on several PA-RISC Systems running HP-UX 11.00,
and to lower the maintenance costs, they plan a hardware refresh using HP Itanium i2Server
Blades.
Which HP Solution allows a seamless transaction of the operating system and application to the
new hardware without updating it to the current release?
Which tool can be used to perform a complete power sizing for this solution?
You are creating an offer for a mixed BladeSystem and rack Mount environment. Which tool can
be used to perform a complete power sizing for this solution?
What needs to be done to get this UPS configuration working as a redundant UPS solution and gracefully shutdow
After sizing a rack with several ProLiant DL380p Gen8 servers running Windows Server 2008 R2
to use a redundant UPS Solution, a customer orders two HP UPS R7000s. What needs to be
done to get this UPS configuration working as a redundant UPS solution and gracefully shutdown
Windows Server 2008 R2 when a power failure occurs at the input feed of both R7000 UPSs?
How can you validate that the operating systems currently in use are supported on Gen8 server?
A customer is asking you to evaluate virtualization and consolidation of their current infrastructure.
You know they are running different operating systems’ versions. How can you validate that the
operating systems currently in use are supported on Gen8 server?
Which tool is used to size a UPS for a given Gen8 Server solution?
Which tool is used to size a UPS for a given Gen8 Server solution?
Which incorrect module configuration can satisfy the customer’s future expansion plans?
You are planning an HP BladeSystem solution on a c7000 enclosure. In addition to the
connectivity requirements shown in the picture. The customer wants to be able to configure
additional network connections with a speed of 2×10 GB LACP for each A5820 switch.
Which incorrect module configuration can satisfy the customer’s future expansion plans?
Which tool will help you to qualify and efficiently generate the document to fulfill customer expectations?
You are working on consolidation project. The customer is asking for a complete customized
solution document demonstrating advantages and long term benefits of the solution. They need it
urgently to justify the investment.
Which tool will help you to qualify and efficiently generate the document to fulfill customer
expectations?