Which HP strategy supports the customer roadmap and should be presented in the next meeting?
A customer wants to align their IT structure from their desktop to their rapidly-growing Enterprise
data centers.
They need support in designing a long-term strategy. The HP design team wants to present a
roadmap to migrate the existing traditional environment into a virtualized infrastructure.
Which HP strategy supports the customer roadmap and should be presented in the next meeting?
Which phases are part of SAN deployment?
Which phases are part of SAN deployment? (Select four.)
Which Remote Copy topology would allow the customer to achieve this activity?
A customer wants to replicate the same data on their HP 3PAR StoreServ storage arrays to two
separate campus locations. Which Remote Copy topology would allow the customer to achieve
this activity?
What must you ensure when designing a SAN solution that integrates old and new components?
What must you ensure when designing a SAN solution that integrates old and new
components?
which factor needs to be considered?
Refer to the Exhibit:
The customer wants to implement an HP StoreOnce solution for the environment shown.
You have been given the following information:
– Each branch office has approximately 100 GB of data.
– Philadelphia has approximately 2 TB data.
– Pittsburg has approximately 1 TB data.
– All backup data will be replicated back to the data center in Pittsburg.
– Costs should be kept to a minimum but allow for the possibility of adding three more sites.
When designing the solution, which factor needs to be considered?
How can oversubscription in a SAN be prevented?
How can oversubscription in a SAN be prevented?
Which tool should you use?
A client asks you to demonstrate the capabilities of an HP 3PAR StoreServ 7000 Storage array.
Which tool should you use?
What is the impact on scalability?
Your customer is concerned about IT spending and requests that all components used in the
SAN design be fully utilized. What is the impact on scalability?
Which components do you propose to change to meet their budget goals without sacrificing their critical to qua
A small service provider customer is in the process of a merger and needs to purchase additional
IT infrastructure components to support the expansion of their customer base. The goal is to offer
same-day repair from any hardware failures and increased high availability from the servers to the
local array.
The new proposal provides the following Bill of Materials (BOM):
– HP StoreSure 2000 – 155 TB of Midline SAS SFF Drives – FC Controller Pair
– A pair of HP SN6000B 16Gb 48-port/48-port Active Fibre Channel switches
– HP P2000 Remote Snap Software
– HP SN1000 2 Port 16 Gb HBAs
– 24 Fibre Channel cables
– 10 HP ProLiant DL360 Gen8s
– vSphere Enterprise Plus and vCenter licenses from HP
– Call-to-repair 24×7 coverage with four-hour on-site response
The customer operating budget is constrained, and the price of the BOM is too high.
Which components do you propose to change to meet their budget goals without sacrificing their
critical to quality goals? (Select two.)
What is the final phase when planning an HP SAN solution?
What is the final phase when planning an HP SAN solution?