Under which set of circumstances would a lower priority job run before a higher priority job when
both start at the same time?

PrepAway - Latest Free Exam Questions & Answers

A.
When the lower priority job has multiplexing enabled and can join an existing multiplex group

B.
When the lower priority job requires media in a volume pool

C.
When the higher priority job can use the media already loaded in the drive

D.
When the higher priority job has multiple streams set to 4 and four tape drives are available

Explanation: