PrepAway - Latest Free Exam Questions & Answers

which set of circumstances would a lower priority job r…

Under which set of circumstances would a lower priority job run before a higher priority job when both start at
the same time?

PrepAway - Latest Free Exam Questions & Answers

A.
when the lower priority job has multiplexing enabled and can join an existing multiplex group

B.
when the lower priority job requires media in a volume pool

C.
when the higher priority job can use the media already loaded in the drive

D.
when the higher priority job has multiple streams set to 4 and four tape drives are available


Leave a Reply