PrepAway - Latest Free Exam Questions & Answers

What are two possible ways to achieve this goal?

You are testing an application. The application includes methods named Calculatelnterest and LogLine. The
Calculatelnterest () method calculates loan interest. The Logl_ine() method sends diagnostic messages to a
console window.
The following code implements the methods. (Line numbers are included for reference only.)

You have the following requirements:
-The Calculatelnterest() method must run for all build configurations. -The LogLine() method must run only
for debug builds.
You need to ensure that the methods run correctly.
What are two possible ways to achieve this goal? (Each correct answer presents a complete solution.
Choose two.)

PrepAway - Latest Free Exam Questions & Answers

A.
Insert the following code segment at line 01:
#region DEBUG
Insert the following code segment at line 10:
#endregion

B.
. Insert the following code segment at line 10:
[Conditional(DEBUG”)]

C.
. Insert the following code segment at line 05:
#region DEBUG
Insert the following code segment at line 07:
#endregion

D.
. Insert the following code segment at line 01:
#if DE30G Insert the following code segment at line10: #endif

E.
Insert the following code segment at line 01:
[Conditional(DEBUG”)]

F.
Insert the following code segment at line 05:
#if DEBUG
Insert the following code segment at line 07:
#endif

G.
. Insert the following code segment at line 10:
[Conditional(“RELEASE”)]

2 Comments on “What are two possible ways to achieve this goal?


Leave a Reply