Briefing ISEB Knowledge

Which of the following should be considered when designing measurement systems, methods and metrics?

Which of the following should be considered when designing measurement systems,
methods and metrics?
The services
The architectures
The configuration items
The processes

A.
1, 2 and 3 only

B.
1, 3 and 4 only

C.
2, 3 and 4 only

D.
All of the above