EMC Exam Questions

What is the calculated cost from host to storage, in the diagram, if a link fails in a port channel

Refer to the Exhibit.

What is the calculated cost from host to storage, in the diagram, if a link
fails in a port channel group?

A.
250

B.
375

C.
1500

D.
500