drag the host addresses on the left to the correct router interface.

DRAG DROP

Riverside Towing is redesigning the network that connects its three locations. The administrator
gave the networking team 192 168.45 0 to use for addressing the entire network. After subnetting
the address, the team is ready to assign the addresses. The administrator plans to configure ip
subnet-zero and use RIP v2 as the routing protocol. As a member of the networking team, you
must address the network and at the same time conserve unused addresses for future growth.
With those goals in mind, drag the host addresses on the left to the correct router interface. One of
the routers is partially configured. Move your mouse over a router to view its configuration. Not all
of the host addresses on the left are necessary.

You must accomplish the following tasks:

CORRECT TEXT
VTP Configuration LAB.
A new switch is being added to the River Campus LAN. You will work to complete this process by
first configuring the building_210 switch with an IP address and default gateway. For the switch
host address, you should use the last available IP address on the management subnet. In
addition, the switch needs to be configured to be in the same VTP domain as the building_100
switch and also needs to be configured as a VTP client. Assume that the IP configuration and VTP
configuration on building_100 are complete and correct.
The configuration of the router is not accessible for this exercise. You must accomplish the
following tasks:
Determine and configure the IP host address of the new switch.
Determine and configure the default gateway of the new switch.
Determine and configure the correct VTP domain name for the new switch.
Configure the new switch as a VTP client.

A network associate is configuring a router for the weaver company to provide internet access.

CORRECT TEXT

A network associate is configuring a router for the weaver company to provide internet access.
The ISP has provided the company six public IP addresses of 198.18.184.105 198.18.184.110.
The company has 14 hosts that need to access the internet simultaneously. The hosts in the
company LAN have been assigned private space addresses in the range of 192.168.100.17 –
192.168.100.30.
The following have already been configured on the router
– The basic router configuration
– The appropriate interfaces have been configured for NAT inside and NAT outside
– The appropriate static routes have also been configured (since the company will be a stub
network, no routing protocol will be required.)
– All passwords have been temporarily set to “cisco”