which of the following is most correct?

Following preliminary design done with Google Earth and the Aruba Outdoor Planner, which of the
following is most correct?

PrepAway - Latest Free Exam Questions & Answers

A.
Once the preliminary design is accepted, a final design and BoM should be created by adding a
little “fudge factor”.

B.
A site survey should be conducted to verify assumptions and gather additional data to formulate
the final design and BoM

C.
The customer should be expected to order based on the preliminary design and BoM.

D.
Give the preliminary design to the customer with a disclaimer for possible inaccuracies

Explanation: