VMware Exam Questions

Based on the information, what is the likely problem

ACME Logging Inc. has been using the vSphere Web Client template to five-node vSphere 5 cluster. After deploying a new template, the resulting virtual machine is not able to connect the deployment network to which it was assigned. When deploying another template, the message in the exhibit is show.

Based on the information, what is the likely problem ?

A.
Host esxi2 does not have the network uplink attached to the Production vSwitch.

B.
Host esxi2 does not have the Production network created to bind to.

C.
DRS must be enabled if you are deploying templates into a cluster.

D.
A vDS must be configured it you are deploying templates into a cluster.