What three steps are necessary to enable Jumbo Frames f…

What three steps are necessary to enable Jumbo Frames for use with an iSCSI storage array? (Choose three.)

A.
Configure the MTU on the physical switch.

B.
Configure the MTU on the virtual switch.

C.
Configure the MTU on the VTEP.

D.
Configure the MTU on the LAG group.

E.
Configure the MTU on the VMKernel port.