SNIA Exam Questions

Which two (2) steps should be completed after replacing the HBA to bring the application server back

A HBA has failed in an application server that connects to a Fabric that uses WWPN zoning. Which
two (2) steps should be completed after replacing the HBA to bring the application server back online? (Choose two.)

A.
Change the zone configuration.

B.
Change the application metadata server.

C.
Change the WWPN login of the HBA.

D.
Change the LUN masking configuration.