When you arrive on a customer site, you discover that the customer network administrator has called in sick. While required power has been provided and all of the
components ordered have been physically accounted for, the network will not be operational today. Which would be the most useful tool to complete your rack &
stack and initial configuration of the system? (Choose the best answer.)

A.
a Serial Port cable
B.
a CD containing the 10.86 version of SANtricity
C.
a standalone switch or hub
D.
None of the above, come back tomorrow.