NetApp Exam Questions

Referring to the exhibit, which steps are required to get an HA cabled system?


You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site.
Referring to the exhibit, which steps are required to get an HA cabled system?

A. 1. Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 4.
2. Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 4.
3. Cable the out-of-band ACP.
B. 1. Insert a cable from right controller port 0a to IOMA port 1, and from port 0b to IOMB port 3.
2. Insert a cable from left controller port 0a to IOMB port 1, and from port 0b to IOMA port 3.
C.

1. Insert a cable from right controller port 0a to IOMB port 1, and from port 0b to IOMA port 4.
2. Insert a cable from left controller port 0a to IOMA port 1, and from port 0b to IOMB port 4.
3. Cable the out-of-band ACP.

D. 1. Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 3.
2. Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 3.