DRAG DROP
You are a systems administrator for a company that uses Windows 7 computers.
The company plans on upgrading all the computers. You have configured one computer, named
SOURCE, with a power plan that meets a criteria for reduced power consumption. You want to test
this power plan on another computer named DEST.
You need to transfer the power plan from SOURCE to DEST.
Which three actions should you perform in sequence? (To answer, move the appropriate four
actions from the list of actions to the answer area and arrange them in the correct order. )

Note:
* powercfg. exe
You can use the Powercfg. exe tool to control power settings and configure computers to default to
Hibernate or Standby modes.
The Powercfg. exe tool is installed with Windows.
/Syntax:
powercfg [-l] [-q ] [-x] [-changename] [-duplicatescheme] [-d] [-deletesetting] [-setactive] [-
getactivescheme] [-setacvalueindex] [-setdcvalueindex] [-h] [-a] [-devicequery] [-deviceenablewake]
[-devicedisablewake] [-import] [-export] [-lastwake] [-?] [-aliases] [-setsecuritydescriptor] [-
getsecuritydescriptor]
/ export filename GUID
Exports a power scheme, represented by the specified GUID, to the specified file.
/ -import filename [GUID]
Imports all power settings from the specified file.