You create a new product that has a new bill of materials (BOM). The lines for each
component are added to the BOM lines. You need to configure the BOM to prevent the line
for item 700 and the line for item 500 from both being selected in the BOM. What should
you create?

A.
A configuration route for item 700 by using the Select method for 500
B.
A configuration rule for item 700 by using The Select method for 500
C.
A configuration route for item 700 by using the Deselect method for 500
D.
A configuration rule for item 700 by using the Deselect method for 500
the correct answer is D:A configuration rule for item 700 by using the Deselect method for 500.
0
0
I’m agree it’s answer D
0
0
D.
0
0