PrepAway - Latest Free Exam Questions & Answers

Category: 70-512

Exam 70-512: TS: Visual Studio Team Foundation Server 2010, Administration

What should you do?

You have a Visual Studio Team Foundation Server 2010 environment. Your build lab includes multiple build servers.
You configure the build servers, build controllers, and build agents for a team project collection. You customize the build process workflow file to include custom activities that you have compiled into an assembly.
You need to ensure that the assembly is loaded by the build service process on the build servers.
What should you do?

What are two possible ways to achieve this goal?

You have a Visual Studio Team Foundation Server 2010 environment that has a build controller with ten associated build agents for a team project collection. You use the default build process template (DefaultTemplate.xaml) for all build definitions. When running multiple builds, you intermittently receive a build error on the AgentScope workflow activity indicating that an agent was not available in the allotted amount of time. These error messages occur during peak periods of heavy usage of the build lab. You need to troubleshoot the unavailability of the build agents during the peak periods. What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.)

Which two actions should you perform?

You have a Visual Studio Team Foundation Server 2010 environment that is configured to support Visual Studio Lab Management 2010.
You intend to perform automated testing by using Microsoft Test Manager 2010. You need to install and configure a test controller and a test agent that will run Coded UI tests. Which two actions should you perform? (Each correct answer presents part of the solution.
Choose two.)

What should you do?

You manage a Visual Studio Team System 2008 Team Foundation Server environment that supports a Windows SharePoint Services (WSS) 2.0 SharePoint portal. You need to upgrade the current environment to Visual Studio Team Foundation Server 2010 on the existing hardware and support the existing SharePoint portal integration with no additional administrative steps.
What should you do?

Which configuration wizard options should you use on Server2 and Server3?

You are upgrading a Visual Studio Team System 2008 Team Foundation Server environment to Visual Studio Team Foundation Server 2010.
The Team Foundation Server 2010 environment will consist of three new servers with the following configuration:
Server1 hosts the data tier
Server2 and Server3 host application tiers
You complete the prerequisite installations, restore the SQL Server databases onto Server1, and deploy Network Load Balancing. You need to install the Team Foundation Server components.
Which configuration wizard options should you use on Server2 and Server3?

What should you do?

You manage a dual-tier Visual Studio Team Foundation Server 2010 environment using servers that run Windows Server 2008 R2. Your company has an Active Directory Domain Services (AD DS) domain. All servers and client computers are joined to the domain. You run Windows SharePoint Services 3.0 on the application tier server for the team project portal sites.
You need to ensure that Team Foundation Server uses the Kerberos authentication protocol.
What should you do?


Page 8 of 9« First...56789