What are two possible ways to achieve this goal? (Each answer presents a complete solution
You manage your existing virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are designing a highly available Hyper-V solution. You need to minimize the downtime of virtual machines (VMs) during maintenance periods. What are two possible ways to achieve this goal? (Each answer presents a complete solution. Choose two.)
You need to ensure that the NLB cluster converges
You have a Windows Server 2008 R2 Hyper-V failover cluster that has 16 nodes. You plan to load- balance eight virtual machines (VMs) on the Hyper-V failover cluster by using network load balancing (NLB). You need to ensure that the NLB cluster converges.
What should you do?
You need to ensure that the network supports this design
You are designing a Windows Server 2008 R2 Hyper-V environment. Your design includes a failover cluster that supports live migration. You need to ensure that the network supports this design.
What should you do?
You need to ensure the highest level of availability for virtual machines (VMs) that run on the cluster
Your network includes four servers that run Windows Server 2008 R2. Each server has the network configuration shown in the following table. You are designing a Hyper-V failover cluster. You need to ensure the highest level of availability for virtual machines (VMs) that run on the cluster. What should you do?
What should you include in the recommendation?
You plan to deploy the Virtualization technologies of Microsoft Desktop Optimization Pack (MDOP).
You need to recommend a licensing solution for the planned deployment.
What should you include in the recommendation?
What should you include in the recommendation?
You plan to deploy two virtual machines (VMs) that will be configured as nodes in a failover cluster. The VMs will run file and print services. You need to recommend a storage solution for the planned deployment.
What should you include in the recommendation?
How can you configure the file servers to replicate virtual applications between the three offices and minimiz
You work as a network administrator at ABC.com. The company has offices in New York, Seattle and Toronto. All three offices are part of a single Active Directory Domain Services domain named ABC.com. All servers run Windows Server 2008 R2 and all client computers run Windows 7 Enterprise.
All three offices are connected to each other by slow WAN links.
Microsoft Application Virtualization (App-V) 4.6 is used in each office to virtualize applications. Sequencing is performed by Desktop Technicians in each office and users stream virtual applications from a local file server.
How can you configure the file servers to replicate virtual applications between the three offices and minimize the WAN link bandwidth usage?
Which MAP assessment should you choose?
Your virtual environment includes Microsoft Virtual Server 2005 R2 and third-party hypervisors.
The virtual machines (VMs) include messaging, application, and database servers.
You intend to standardize on Windows Server 2008 R2 Hyper-V servers.
You are developing a migration plan by using the Microsoft Assessment and Planning (MAP) Toolkit.
You need to gather the necessary information to analyze the current virtual environment.
Which MAP assessment should you choose?
Which three of the following steps describe how you should create the virtualized Sales application package? (
You work as a network administrator at ABC.com. The ABC.com network consists of an Active Directory Domain Services domain named ABC.com. All servers on the network run Windows Server 2008 R2. All client computers run Windows 7 Enterprise.
The ABC.com virtualization environment includes Remote Desktop Services, Microsoft Application Virtualization (App-V) 4.6 and Microsoft Enterprise Desktop Virtualization (MED-V).
Members of the ABC.com Sales team use portable computers and often work away from the office.
You want to create a virtualized application package that contains two Sales applications. The Sales applications require authorization to run and will need to be available for offline use for the roaming Sales users.
Which three of the following steps describe how you should create the virtualized Sales application package? (Choose three. Each answer represents part of the solution).
Which VM should you choose?
Your network includes Microsoft Hyper-V Server 2008 R2 servers. Each Hyper-V server runs multiple virtual machines (VMs). The VM guest operating systems include Windows Server 2003 and Windows Server 2008 R2.
You are analyzing VM performance metrics to complete capacity planning for the Hyper-V servers. The performance metrics for the VMs are shown in the following table.
You need to identify the VM that is showing indications of reduced performance.
Which VM should you choose?