Which two actions should you perform?

You are developing an application by using a team of developers and a team of testers. You have an
automated nightly build.
Currently, the testers take too long to test and the developers are closing a large number of bugs as “unable to
reproduce.”
You need to improve the test cycle time.
Which two actions should you perform? (Each correctanswer presents part of the solution.
Choose two.)

You need to get feedback from your stakeholders to verify that your application meets their requirements befor

(DRAG&DROP)
You are developing a new application that contains complicated validation and transformation logic on data
pulled from three separate source systems.
You need to get feedback from your stakeholders to verify that your application meets their requirements
before any other development tasks have been started. You also need to ensure that this application subsystem is correct before any other dependent modulecan be developed.
What should you do? (To answer, move the five appropriate actions from the list of actions to the answer area
and arrange them in the correct order.)

You need to configure only the TFS URL to be the following fully qualified domain name (FQDN): http://tfs.cont

Your network environment is configured according tothe following table:

Your TFS environment is configured with the following URLs:
· TFS: http://tfssrv:8080/tfs
· Reporting: http://tfssrv/reports
· SharePoint: http://tfssrv/sites
You need to configure only the TFS URL to be the following fully qualified domain name (FQDN):
http://tfs.contoso.com. You log on to the application-tier server. What should you do next?

Which three actions should you perform?

You are a technical team lead. Your company networkincludes a Microsoft Visual Studio Team Foundation
Server (TFS) 2012 server.
You are assigned to work on a project with an internal development team and an off-site vendor who is new to
working with your company.
You need to ensure that the code delivered by the off-site vendor is of an acceptable quality, conforms to
standards, and does not affect production support.
Which three actions should you perform? (Each correct answer presents a complete solution. Choose three.)

You need to meet the following requirements: · Point the working path to drive D

Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. A
single build machine is installed with one controller and two agents. The working directories are configured to
use the following working directory:
$(SystemDrive)\Builds\$(BuildAgentId)\$(BuildDefinitionPath). Your system drive is running out of space and
some builds often fail with the following error:
“The specified path, file name, or both are too long. The fully qualified file name must be less than 260
characters, and the directory name must be less than 248 characters.” You need to meet the following
requirements:
· Point the working path to drive D.
· Construct a working directory that can be used todefine the shortest unique path for each build agent it is
used on.
What should you do?

Which of the following diagrams shows thecorrect architecture for solving this problem?

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
Your TFS environment currently consists of a singleteam project collection (TPC) named DevTPC, one build
controller named BC-1, and one build agent named BA-1. You need to create a separate TFS test environment
by cloning your existing environment. You need to achieve this goal by utilizing as few new TFS services as
possible. Which of the following diagrams shows thecorrect architecture for solving this problem?