PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

Which of the following actions should you take?

You are employed as a developer at ABC.com. ABC.com has ABC.com has a single Active
Directory domain, named ABC.com. ABC.com makes use of Microsoft Visual Studio 2012 for
development purposes.
ABC.com has assigned you the scrum master role for a sizeable development project. The project
team has close to 20 members that should be split into several scrum teams.
You want to make sure that the teams clash as little as possible, while also boosting flexibility with
regards to releasing results.
Which of the following actions should you take?

Which of the following actions should you perform to resolve the issue?

Topic 1, ABC Solutions
General Overview
You are the Senior Database Administrator (DBA) for a software development company named
ABC Solutions.
Existing Environment – Active Directory
The network consists of an Active Directory Domain Services (AD DS) forest that includes a single
domain named CharnTech.com
All domain controllers run Windows Server 2008 R2 Service Pack 1 (SP1). A number of domain
member servers have been upgraded to Windows Server 2012. The remaining member servers
run Windows Server 2008 R2 Service Pack 1 (SP1). The client computers run either Windows 8
Professional or Windows 7 Professional with Service Pack 1 (SP1).
The functional level of the domain is Windows Server 2008 R2 and the functional level of the
forest is Windows Server 2008.
Existing Environment – SQL Servers
A Windows Server 2008 R2 Service Pack 1 (SP1) server named SQLReporting01 runs SQL
Server 2008 R2 Reporting Services (SSRS). SQL Server on SQLReporting1 is configured to run in
Native Mode.
A Windows Server 2008 R2 Service Pack 1 (SP1) server named SQLAnalysis01 runs SQL Server
2008 R2 Analysis Services (SSAS).
A Windows Server 2008 R2 Service Pack 1 (SP1) server named SQLAnalysis02 runs SQL Server
2008 R2 Analysis Services (SSAS). SQLAnalysis01 and SQLAnalysis02 are configured as nodes
in a SQL Server active/passive failover cluster. SQLAnalysis01 is currently the active node in the
cluster.
Existing Environment – Databases
The SQL Server environment hosts the databases shown in the following table.

The databases have a full backup taken every day.
Existing Environment – Server Roles
SQLReporting01 contains 120 reports that are generated all day every day. The reports access
databases on the SSAS cluster for Sales and Production analysis. The reports are also used for
data modeling by analysts in the Development department.
A domain user account named SQLReporting01acc is used by the SSRS service on
SQLReporting01.
Planned Changes.
The company plans to upgrade the SQL Servers to SQL Server 2012. You will be working with the
Systems Administrator perform the upgrade. Downtime of the SQL Servers must be minimized
during the upgrade.
Two new servers will be implemented before the current SQL Servers are upgraded.
A Windows Server 2008 R2 Service Pack 1 (SP1) server named SQLReporting02 will be joined to
the domain and configured to run SQL Server 2008 R2 Reporting Services (SSRS).
SQLReporting02 will host snapshots of business critical reports to ensure their availability during
the upgrade. You will use Reporting Services file-only installation mode to install SSRS on
SQLReporting02 and then restore and configure copies of the Reporting Services databases from
SQLReporting01 from backups taken every night. The configuration of SQLReporting02 including
configuration files and custom assemblies will be manually synchronized with SQLReporting01.
A Windows Server 2012 server named SSAS2012 will be installed and configured to run SQL
Server 2012 Analysis Services. This server will be used as a disaster recovery server in the event
of problems occurring during the upgrade of the SSAS cluster. All databases on the SSAS cluster
will be copied to this server prior to the upgrade. You need to minimize administrative effort and
downtime when moving the databases to SSAS2012. Client applications that connect to SQL
Server 2012 Analysis Services will be tested using this server.
SQLAnalysis01 and SQLAnalysis02 have been prepared for the upgrade to SQL Server 2012 by
having the shared components and SQL Server 2012 prerequisites upgraded.
As part of the upgrade to SQL Server 2012 Analysis Services, the Production, Sales, Customers
and Human Resources databases will be converted to tabular BI Semantic Models (BISMs).
The Development database will be detached from the SSAS cluster and attached to SSAS2012 to
ensure that it is available for modeling during the upgrade.

Requirements:
Technical Requirements:
All databases on the SSAS cluster must be backed up prior to the upgrade. To minimize the
processing time taken to restore the backups, the backups need to include just the aggregations,
metadata and partitioning. You need to minimize the storage space and processing time used by
the backups.
A DR (Disaster Recovery) plan must be designed for SQLReporting01. In the event of a system
failure, the minimum components required for reports to be available must be recovered as quickly
as possible.
Security Requirements:
A company security policy has stated the following requirements:
Kerberos delegation must be used by SQLReporting01 for connections to databases on the SSAS
cluster.
Client computers connecting to SQLReporting01 must use the most secure level of domain
security.
Reports distributed by email must be secured using SSL.
Reporting and Analysis requirements
The company has stated the following reporting and analysis requirements for after the upgrade:
Company users need to be able to use the Microsoft Excel PivotTable client to perform ad-hoc
analysis of SSAS databases. To facilitate this, you must deploy a cached data model that will
source data from an OData feed.
*************************************

ABC users report that they are not receiving report subscriptions from SQLReporting01.
You confirm that the report subscriptions are not being delivered.
Which of the following actions should you perform to resolve the issue?

Which of the following actions should you take FIRST?

You are employed as a developer at ABC.com. ABC.com has ABC.com has a single Active
Directory domain, named ABC.com. ABC.com makes use of Microsoft Visual Studio 2012 for
development purposes.
You have been tasked with creating a new ABC.com application. The application includes
complex validation and transformation logic on information gathered from three different source
systems.
Prior to starting more development tasks, the stakeholders have to indicate whether the
application satisfies their prerequisites. Furthermore, you want to make sure that the application
sub-system is accurate.
Which of the following actions should you take FIRST?

Which of the following actions should you take?

You are employed as a software tester at ABC.com. ABC.com has a single Active Directory
domain, named ABC.com.
You are preparing to deploy Microsoft Test Manager (MTM) in ABC.com’s environment. You have
been informed that the first phase of testing will only allow for manual testing.
You need to select the necessary data diagnostic adapter.
Which of the following actions should you take?

Which of the following actions should you take?

You are employed as a developer at ABC.com. ABC.com has ABC.com has a single Active
Directory domain, named ABC.com. ABC.com makes use of Microsoft Visual Studio 2012 for
development purposes.
You have been tasked with creating a new application for ABC.com. You have been assigned a
team of developers, and a team of testers to achieve this. You have configured a build to run
automatically every night.
As a result of testers taking a long time to test and developers marking a large number of bugs as
“unable to reproduce”, you are required to make the test cycle time better.
Which of the following actions should you take?

Which of the following actions should you take?

You are employed as a software tester at ABC.com. ABC.com has a single Active Directory
domain, named ABC.com. ABC.com makes use of Microsoft Test Manager (MTM) for testing
purposes.
You are in the process of manually testing an application. Your test plan should allow for
diagnostic data to be acquired from the local machine and a remote SQL Server.
You have been instructed to make sure that the test environment is suitably configured to meet the
prerequisites.
Which of the following actions should you take?

Which of the following could be specified?

You are employed as a developer at ABC.com. ABC.com has ABC.com has a single Active
Directory domain, named ABC.com. ABC.com makes use of Microsoft Visual Studio 2012 for
development purposes.
You have been assigned to a development team that makes use of Scrum. You have been tasked
with measuring the impact of any process changes. To do this, you have to specify the necessary
key metrics.
Which of the following could be specified?

Which of the following actions should you take?

You are employed as a developer at ABC.com. ABC.com has a single Active Directory domain,
named ABC.com. The ABC.com network contains a Microsoft Visual Studio Team Foundation
Server (TFS) 2012 server.
You have been assigned to an internal development team as a technical team lead. The team
works in conjunction with a new external vendor on a project.
You have been instructed to make sure that the new external vendor supplies code of adequate
quality that corresponds to standards, and has no influence on production support.
Which of the following actions should you take?