PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

Which three actions should you perform in sequence?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

DRAG DROP
You need to collect the required security logs.
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.

You plan to configure Windows Network Load Balancing (NLB) for a company.

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

HOTSPOT
You plan to configure Windows Network Load Balancing (NLB) for a company. You display following
Network Load Balancing Manager window:

Use the drop-down menus to select the answer choice that answers each question based on the
information presented in the graphic.

How should you configure the access?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

DRAG DROP
You need to configure access to the Certificate Revocation Lists (CRLs).
How should you configure the access? To answer, drag the appropriate protocol or servers to the
correct network type. Each protocol or server may be used once, more than once, or not at all. You
may need to drag the split bar between panes or scroll to view content.

Which three actions should you perform in sequence?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

DRAG DROP
You need to implement Windows Network Load Balancing (NLB).
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in correct order.

Which two technologies achieve the goal?

Your network contains an Active Directory domain. The domain contains 10 file servers. The file
servers connect to a Fibre Channel SAN. You plan to implement 20 Hyper-V hosts in a failover
cluster.
The Hyper-V hosts will not have host bus adapters (HBAs).
You need to recommend a solution for the planned implementation that meets the following
requirements:
The virtual machines must support live migration.
The virtual hard disks (VHDs) must be stored on the file servers.
Which two technologies achieve the goal? Each correct answer presents a complete solution.

What should you recommend?

Your network contains two data centers named DataCenter1 and DataCenter2. The two data centers
are connected by using a low-latency high-speed WAN link.
Each data center contains multiple Hyper-V hosts that run Windows Server 2012. All servers connect
to a Storage Area Network (SAN) in their local data center.
You plan to implement 20 virtual machines that will be hosted on the Hyper-V hosts.
You need to recommend a hosting solution for the virtual machines.
The solution must meet the following requirements:
Virtual machines must be available automatically on the network if a single Hyper-V host fails.
Virtual machines must be available automatically on the network if a single data center fails.
What should you recommend?

Which servers should you identify?

HOTSPOT
You plan to implement a virtualization solution to host 10 virtual machines. All of the virtual
machines will be hosted on servers that run Windows Server 2012.
You need to identify which servers must be deployed for the planned virtualization solution.
The solution must meet the following requirements:
• Minimize the number of servers.
• Ensure that live migration can be used between the hosts.
Which servers should you identify?
To answer, select the appropriate servers in the answer area.

What should you identify?

Your network contains a Hyper-V cluster named Cluster1.
You install Microsoft System Center 2012 Virtual Machine Manager (VMM).
You create a user account for another administrator named User1.
You plan to provide User1 with the ability to manage only the virtual machines that User1 creates.
You need to identify what must be created before you delegate the required permissions.
What should you identify?

You need to ensure that the changes to Template1 can be applied to the existing instances in the production en

Your network contains an Active Directory domain named contoso.com. The domain contains a
Microsoft System Center 2012 infrastructure.
You deploy a second System Center 2012 infrastructure in a test environment.
You create a service template named Template1 in both System Center 2012 infrastructures.
For self-service users, you create a service offering for Template1. The users create 20 instances of
Template1.
You modify Template1 in the test environment. You export the service template to a file named
Template1.xml.
You need to ensure that the changes to Template1 can be applied to the existing instances in the
production environment.
What should you do when you import the template?