PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

Which two actions should you perform?

###BeginCaseStudy###
Case Study: 5
Contoso Ltd Case B
Background
Overview

Contoso, Ltd., is a software development company. The company has a main office in Seattle
and branch offices that are located in Los Angeles and New Delhi. Contoso’s sales staff are
all located in the Los Angeles office. Contoso’s software developers are all located in the
New Delhi office.
Current Environment
The network for the Seattle office contains:
• 2 domain controllers with integrated DNS
• 200 Windows workstations
• 14-node Hyper-V cluster
• 1 file server with multiple shares
• 1 Active Directory Rights Management Services (AD RMS) cluster
The network for the Los Angeles office contains:
• 2 domain controllers with integrated DNS
• 100 Windows workstations
• 1 file server with multiple shares
The network for the New Delhi office contains:
• 2 domain controllers with integrated DNS
• 300 Windows workstations
• 10 Hyper-V servers that host 100 development virtual machines (VMs)
• 50 production virtual machines that are hosted in Azure
All the Contoso offices connect to each other by using VPN links, and each office is
connected to the Internet.
Contoso has a single Active Directory Domain Services (AD DS) domain named
contoso.com. Contoso.com has a configured certification authority (CA). Contoso currently
leverages System Center Virtual Machine Manager 2012 R2 to manage its virtual
environment servers.
Contoso uses an application named HRApp1 for its human resources (HR) department. HR
users report that the application stops responding and must be restarted before they can
continue their work.
Fabrikam Inc
Contoso has recently acquired Fabrikam. Inc. Fabrikam has a single office that is located in
Seattle.
Fabrikam has a single AD DS domain named fabrikam.com.
• The network for Fabrikam contains:
• 2 domain controllers with Active Directory-integrated DNS
• 150 Windows workstations
• 5 Hyper-V servers
• 1 file server with multiple shares
A two-way trust exists between Contoso.com and Fabrikam.com.
Business Requirements
Consolidation
Contoso must complete the consolidation of the Contoso and Fabrikam networks. The
consolidation of the two networks must:
• Minimize all hardware and software costs.
• Minimize WAN traffic.
• Enable the users by providing self-service whenever possible.

Security
Contoso requires that all Windows client devices must be encrypted with BitLocker by using
the Trusted Platform
The CA for the domain contoso.com must be designated as the resource forest. The domain
fabrikam.com must leverage certificates that are issued by the domain contoso.com.
Other Information
HRApp1
Each time HRApp1 stops responding and is restarted, an incident must be created and
associated with the existing problem ticket.
Development environment
You have the following requirements:
• Developers must be able to manage their own VM checkpoints.
• You must implement a disaster recovery strategy for development
virtual machines.
Technical Requirements
Windows System Updates
You have the following system update requirements:
• Consolidate reporting of all software updates in all offices.
• Software updates must be applied to all Windows devices.
• Ensure the ability to report on update compliance.
Monitoring
You have the following monitoring requirements:
• Each time HRApp1 shows performance problems, ensure that a ticket
is created.
• When performance problems are resolved, ensure that the ticket closes
automatically.
Security
You have the following security requirements:
• Ensure that all documents are protected.
• Ensure that contoso.com domain users get use licenses for RMSprotected documents from the domain contoso.com.
• Ensure that fabrikam.com domain users get use licenses for RMSprotected documents from the domain contoso.com.
###EndCaseStudy###

You need to design a solution that meets all of the software update requirements.
Which two actions should you perform? Each correct answer presents part of the solution.

Which servers should you include in the scale-out file cluster?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

You need to implement a new highly available storage solution for the Hyper-V environment. Which
servers should you include in the scale-out file cluster?

You need to configure Active Directory Rights Management Services (AD RMS)

###BeginCaseStudy###
Case Study: 5
Contoso Ltd Case B
Background
Overview

Contoso, Ltd., is a software development company. The company has a main office in Seattle
and branch offices that are located in Los Angeles and New Delhi. Contoso’s sales staff are
all located in the Los Angeles office. Contoso’s software developers are all located in the
New Delhi office.
Current Environment
The network for the Seattle office contains:
• 2 domain controllers with integrated DNS
• 200 Windows workstations
• 14-node Hyper-V cluster
• 1 file server with multiple shares
• 1 Active Directory Rights Management Services (AD RMS) cluster
The network for the Los Angeles office contains:
• 2 domain controllers with integrated DNS
• 100 Windows workstations
• 1 file server with multiple shares
The network for the New Delhi office contains:
• 2 domain controllers with integrated DNS
• 300 Windows workstations
• 10 Hyper-V servers that host 100 development virtual machines (VMs)
• 50 production virtual machines that are hosted in Azure
All the Contoso offices connect to each other by using VPN links, and each office is
connected to the Internet.
Contoso has a single Active Directory Domain Services (AD DS) domain named
contoso.com. Contoso.com has a configured certification authority (CA). Contoso currently
leverages System Center Virtual Machine Manager 2012 R2 to manage its virtual
environment servers.
Contoso uses an application named HRApp1 for its human resources (HR) department. HR
users report that the application stops responding and must be restarted before they can
continue their work.
Fabrikam Inc
Contoso has recently acquired Fabrikam. Inc. Fabrikam has a single office that is located in
Seattle.
Fabrikam has a single AD DS domain named fabrikam.com.
• The network for Fabrikam contains:
• 2 domain controllers with Active Directory-integrated DNS
• 150 Windows workstations
• 5 Hyper-V servers
• 1 file server with multiple shares
A two-way trust exists between Contoso.com and Fabrikam.com.
Business Requirements
Consolidation
Contoso must complete the consolidation of the Contoso and Fabrikam networks. The
consolidation of the two networks must:
• Minimize all hardware and software costs.
• Minimize WAN traffic.
• Enable the users by providing self-service whenever possible.

Security
Contoso requires that all Windows client devices must be encrypted with BitLocker by using
the Trusted Platform
The CA for the domain contoso.com must be designated as the resource forest. The domain
fabrikam.com must leverage certificates that are issued by the domain contoso.com.
Other Information
HRApp1
Each time HRApp1 stops responding and is restarted, an incident must be created and
associated with the existing problem ticket.
Development environment
You have the following requirements:
• Developers must be able to manage their own VM checkpoints.
• You must implement a disaster recovery strategy for development
virtual machines.
Technical Requirements
Windows System Updates
You have the following system update requirements:
• Consolidate reporting of all software updates in all offices.
• Software updates must be applied to all Windows devices.
• Ensure the ability to report on update compliance.
Monitoring
You have the following monitoring requirements:
• Each time HRApp1 shows performance problems, ensure that a ticket
is created.
• When performance problems are resolved, ensure that the ticket closes
automatically.
Security
You have the following security requirements:
• Ensure that all documents are protected.
• Ensure that contoso.com domain users get use licenses for RMSprotected documents from the domain contoso.com.
• Ensure that fabrikam.com domain users get use licenses for RMSprotected documents from the domain contoso.com.
###EndCaseStudy###

DRAG DROP
You need to configure Active Directory Rights Management Services (AD RMS).
What should you do? To answer, drag the appropriate domain or option to the correct location.
Each domain or option may be used once, more than once, or not at all. You may need to drag the
split bar between panes or scroll to view content.

How should you complete the relevant Windows PowerShell command?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

HOTSPOT
You need to deploy the new SQL cluster for App2.
How should you complete the relevant Windows PowerShell command? To answer, select the
appropriate Windows PowerShell segment from each list in the answer area.

Which three actions should you perform in sequence?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

DRAG DROP
You need to implement VM-SQLclusterl.contoso.com.
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.

How should you configure the implementation?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

HOTSPOT
You need to implement the file share for the new virtual desktop environment.

How should you configure the implementation? To answer, select the appropriate option from each
list in the answer area.

How should you configure the locations?

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

HOTSPOT
You need to implement App1.

How should you configure the locations? To answer, select the appropriate option from each list in
the answer area.

You need to enable virtual machine network health detection on all supported clusters

###BeginCaseStudy###
Case Study: 6
Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle.
Each office contains two data centers. All of the data centers and sites for the company have
network connectivity to each other. The company uses a single Active Directory Domain
Services (AD DS) domain.

Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V
cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a
Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
• CHI1-HVNODE1.contoso.com
• CHI1-HVNODE2.contoso.com
• CHI1-HVNODE3.contoso.com
• CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
• CHI2-HVNODEl.contoso.com
• CHI2-HVNODE2.contoso.com
• CHI2-HVNODE3.contoso.com
• CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
• CHI-SERVERl.contoso.com
• CHI-SERVER2.contoso.com
• CHI-SERVER3.contoso.com
• CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are
deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicaoo office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data
center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a
multiple network path configured. The cluster includes two unused SQL Server virtual
machines named SQL-SERVER3 and SQL-SERVERS The cluster includes a Hyper-V Host
group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
• SEA3-HVNODEl.contoso.com
• SEA3-HVNODE2.contoso.com
• SEA3-HVNODE3.contoso.com
• SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes
a Hyper-V Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
• SEA4-HVNODEl.contoso.com

• SEA4-HVNODE2.contoso.com
• SEA4-HVNODE3.contoso.com
• SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
• SEA-SERVERl.contoso.com
• SEA-SERVER2.contoso.com
• SEA-SERVER3.contoso.com
• SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are
deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR)
department. The infrastructure for App1 must reside in a virtual environment and the data
files for App1 must reside on a single shared disk. In addition, the infrastructure for App1
must meet the following requirements:
• maximize data protection
• withstand the loss of a single guest virtual machine
• withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The
cluster has the following requirements:
• It must span multiple sites.
• It must support dynamic quorums.
• It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy
a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server
deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the
following requirements:
• New SQL Server VMs must be deployed only to odd-numbered
servers in the cluster.
• All other new VM guests must be deployed to any available server in
the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop
Environment (VDE). It has the following requirements:
• The file share cluster must withstand the loss of a single server.

• The file share cluster must withstand the loss of a single network path.
• The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new
virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following
requirements:
• The cluster must use a shared virtual hard disk.
• The cluster must have two nodes named VM-SQLNODE1.contoso.com and VM-SQL-NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The
new file share cluster must have a highly available storage solution for a Hyper-V
environment. It has the following requirements:
• The new file share cluster must support guest VM clusters.
• The storage cannot reside on any of the physical Hyper-V hosts.
###EndCaseStudy###

You need to enable virtual machine network health detection on all supported clusters.
What should you do?

What should you modify from the Dynamic Optimization configuration?

Your network contains two servers named Server1 and Server2 that run Windows Server 2012.
Server1 and Server2 have the Hyper-V server role installed and are part of a host group named
Group1 in Microsoft System Center 2012 Virtual Machine Manager (VMM).
Server1 and Server2 have identical hardware, software, and settings.
You configure VMM to migrate virtual machines if the CPU utilization on a host exceeds 65 percent.
The current load on the servers is shown following table.

You start a new virtual machine on Server2 named VM8. VM8 has a CPU utilization of 20 percent.

You discover that none of the virtual machines hosted on Server2 are migrated to Server1.
You need to ensure that the virtual machines hosted on Server2 are migrated to Server1.
What should you modify from the Dynamic Optimization configuration?