PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

Which three actions should you perform in sequence?

DRAG DROP
You administer a Windows Server 2012 R2 server that has the Hyper-V role installed.
You have the following virtual machines (VMs):

You also have the following two switches:

VM-Server1 has network connectivity to VM-Server2 and VM-Server3, as well as the host server,
VM-Server4 has network connectivity to VM-Server5, but NOT to the host server.
You need to configure VM-Server6 to ensure that VM-Server6 has network connectivity only to the
other test VMs. Which three actions should you perform in sequence? To answer, move the
appropriate actions from the list of actions to the answer area and arrange them in the correct
order,

You need to configure the environment

You administer a Windows Server 2012 R2 Hyper-V host server that contains production and test
virtual machines (VMs). You plan to optimize the performance of the VMs.
The following settings must be applied to the VMs:
You must set a maximum value for the input/output operations per second (IOPS) on the test VMs.
You must set a minimum value for the IOPS on the production VMs.
You need to configure the environment. What should you do?

You need to configure Hyper-V to allow higher network throughput and reduce processing overhead related to net

A company has a Windows Server 2012 R2 server that has the Hyper-V role installed. The server has
a single processor and a single 10-gigabit network interface card (NIC). 12 virtual machines (VMs) run
on the server.
You need to configure Hyper-V to allow higher network throughput and reduce processing overhead
related to network operations. What should you do?

You need to deploy the VMs

You administer an environment that uses a Windows Server 2012 R2 Hyper-V cluster and System
Center 2012 R2 Virtual Machine Manager (VMM). You plan to deploy two virtual machines (VMs)
that host a line-of-business (LOS) application.
The VMs must reside on the same Hyper-V host server at all times. The LOB application does NOT
require high availability.
You need to deploy the VMs.
What should you do?

Which three actions should you perform in sequence?

DRAG DROP
You administer a Windows Server 2012 R2 server with the Hyper-V role installed.
You plan to integrate the Hyper-V host server with the existing storage infrastructure.
You need to configure all virtual machines (VMs).
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.

Which three actions should you perform in sequence?

DRAG DROP
You administer a Hyper-V environment that uses Windows Server 2012 R2 and System Center 2012
R2 Virtual Machine Manager (VMM).
A line-of-business (LOB) application requires two virtual machines (VMs). Each VM must have direct
access to existing Fibre Channel storage.
You need to ensure that the two VMs have direct access to Fibre Channel storage.
Which three actions should you perform in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.

You need to configure the guest clusters

HOTSPOT
A company has a Windows Server 2012 R2 Hyper-V environment that contains a single Active
Directory Domain Services domain named Contoso.com. The environment also has three servers
named Host1, Host2, and Host3 that have the Hyper-V role installed. You configure all of the hosts as
a single failover cluster. You have two guest clusters named VM-Cluster1 and VM-Cluster2. The
environment is configured as shown in the following diagram:

When a virtual machine guest cluster node is migrated to another host, the guest cluster fails over to
the other node. You must provide high availability for all virtual machines. Guest clusters must NOT
fail over if they are migrated to another host.
You need to configure the guest clusters.
Use the drop-down menus to complete each statement based on the information presented in the
screenshot. Each correct selection is worth one point.

You need to ensure that you can implement guest clustering

HOTSPOT
You plan to implement guest clustering.
You review the following information:
• Whoami results, as shown in the Whoami Command exhibit (Click the Exhibit button.)

• System information settings, as shown in the System Information Settings exhibit (Click the Exhibit
button.)

• The Add Roles and Features Wizard, as shown in the Features Wizard exhibit (Click the Exhibit
button.)

You need to ensure that you can implement guest clustering.
For each of the following statements, select Yes if the statement is true. Otherwise, select No. Each
correct selection is worth one point.

You need to ensure that the virtual machines remain online during any reboots required by the updates

You are the virtualization administrator for an organization that manages private and public cloudbased resources. The organization uses Windows Server 2008 R2 SP1 Hyper-V. All Hyper-V host
servers are configured as nodes in a four-node cluster. The organization also uses System Center
2012 R2.
Operating system updates to each host server require a system reboot.
You need to ensure that the virtual machines remain online during any reboots required by the
updates.
What should you do?