What kind of testing has taken place?
During a test of a disaster recovery plan the IT systems are concurrently set up at the alternate site. The results
are compared to the results of regular processing at the original site. What kind of testing has taken place?
What would this system be classified as?
During a business impact analysis it is concluded that a system has maximum tolerable downtime of 2 hours.
What would this system be classified as?
Business Continuity Planning (BCP) is defined as a prep…
Business Continuity Planning (BCP) is defined as a preparation that facilitates:
What are the three primary goals of a BIA?
A business impact assessment is one element in business continuity planning. What are the three primary
goals of a BIA?
How often should tests and disaster recovery drills be …
How often should tests and disaster recovery drills be performed?
what should be moved back to the original site first?
After a company is out of an emergency state, what should be moved back to the original site first?
What is electronic vaulting?
What is electronic vaulting?
Which backup type run at regular intervals would take t…
Which backup type run at regular intervals would take the least time to complete?
which of the following is not true?
Of the reasons why a Disaster Recovery plan gets outdated, which of the following is not true?
which is NOT a specific loss criteria that should be co…
Of the following, which is NOT a specific loss criteria that should be considered while developing a BIA?