Business continuity plans are required for:
Business continuity plans are required for:
Which of the following focuses on restoring an organization’s mission-essentialfunctions (MEF) at an alt
Which of the following focuses on restoring an organization’s mission-essential
functions (MEF) at an alternate site?
what is Widgetworld’s best next step?
The Widgetworld Corporation has a business continuity plan that provides for an
alternate processing site that will accommodate 50 percent of the primary processing
facility�s processing capability. Having ascertained this, what is Widgetworld�s
best next step?
_______________ includes activities to test and validate system capability andfunctionality and outlines actio
_______________ includes activities to test and validate system capability and
functionality and outlines actions that can be taken to return the system to normal
operating condition and prepare the system against future outages.
What is a main advantage of using hot sites?
What is a main advantage of using hot sites?
Which of the following is not a drawback of using hot sites?
Which of the following is not a drawback of using hot sites?
A business continuity plan is an example of a __________ control.
A business continuity plan is an example of a __________ control.
The least expensive and most difficult to test computer recovery site is a:
The least expensive and most difficult to test computer recovery site is a:
Failure of a contingency plan is usually due to:
Failure of a contingency plan is usually due to:
Which of the following reasons why a disaster recovery plan gets outdated is nottrue?
Which of the following reasons why a disaster recovery plan gets outdated is not
true?