The method of routing traffic through split cable or duplicate cable facilities is called:
There are several methods of providing telecommunications continuity. The method of routing
traffic through split cable or duplicate cable facilities is called:
The responsibilities of a disaster recovery relocation team include:
The responsibilities of a disaster recovery relocation team include:
Which characteristic of an effective plan does this demonstrate?
While reviewing the business continuity plan of an organization, an IS auditor observed that the
organization’s data and software files are backed up on a periodic basis. Which characteristic of an
effective plan does this demonstrate?
Which of the following disaster recovery/continuity plan components provides the GREATEST assurance of recover
Which of the following disaster recovery/continuity plan components provides the GREATEST
assurance of recovery after a disaster?
Which of the following must exist to ensure the viability of a duplicate information processing facility?
Which of the following must exist to ensure the viability of a duplicate information processing
facility?
An offsite information processing facility with electrical wiring, air conditioning and flooring, but no compu
An offsite information processing facility with electrical wiring, air conditioning and flooring, but no
computer or communications equipment, is a:
A disaster recovery plan for an organization should:
A disaster recovery plan for an organization should:
Which of the following is the MOST cost-effective solution?
A disaster recovery plan for an organization’s financial system specifies that the recovery point
objective (RPO) is no data loss and the recovery time objective (RTO) is 72 hours. Which of the
following is the MOST cost-effective solution?
Which of the following would be the BEST contingency plan for the communications processor?
A financial institution that processes millions of transactions each day has a central communications
processor (switch) for connecting to automated teller machines (ATMs). Which of the following
would be the BEST contingency plan for the communications processor?
The cost of ongoing operations when a disaster recovery plan is in place, compared to not having a disaster re
The cost of ongoing operations when a disaster recovery plan is in place, compared to not having a
disaster recovery plan, will MOST likely: