An offsite information processing facility having electrical wiring, air conditioning and flooring, but
no computer or communications equipment is a:
A.
cold site.
B.
warm site.
C.
dial-up site.
D.
duplicate processing facility.
Explanation:
A cold site is ready to receive equipment but does not offer any components at the site in advance
of the need.
Incorrect answers:
B)
A warm site is an offsite backup facility that is configured partially with network connections and
selected peripheral equipment, such as disk and tape units, controllers and CPUs, to operate an
information processing facility.
D)
A duplicate information processing facility is a dedicated, self-developed recovery site that can
back up critical applications.