In the following figure, what TWO things must be done before an EtherChannel can be created
from the ent0 and ent1 adapters?

A.
The ent0 and ent1 adapters must be connected to different switches to provide both additional
bandwidth and adequate redundancy in the EtherChannel that is created.
B.
EtherChannel support capability must be verified for the Ethernet switch.
C.
The IP configuration must be removed from en0.
D.
The AIX host must be completely disconnected from the network,
E.
The en1 interface must be configured with IP information.
Explanation: