An AIX customer is running AIX 5.3 on a POWER7 machine and wants to run this workload on a POWER8 server without upgrading their operating system.
What is their best option to migrate their workload?

A.
Power HA failover
B.
Live Partition Mobility
C.
Power VC
D.
Versioned WPAR
D
0
0
D
0
0
D
0
0
D
0
0