What is a prerequisite for using the Replace/Remove task of the PCI Hot Plug Manager?

A physical LPAR has a failed Fibre Channel adapter, which was providing redundant SAN access.
What is a prerequisite for using the Replace/Remove task of the PCI Hot Plug Manager?

A.
Verify HMC RMC connectivity.

B.
Unconfigure the adapter and child devices.

C.
Make sure a spare adapter slot is available.

D.
Provide additional SAN cabling.

Explanation: