PrepAway - Latest Free Exam Questions & Answers

Tag: Exam 000-109

Exam 000-109: Virtualization Technical Support for AIX and Linux – v2

Which of the following actions would allow the administrator to deploy the system plan from the old system to

An administrator would like to use system plans to clone the partition definitions of an existing
Power 795 system to a new Power 795. Both systems have the same hardware configuration.
When the administrator attempts to deploy the system plan taken from the old system to the new
one the ‘Deploy System Plan’ wizard fails at the hardware validation stage.
Which of the following actions would allow the administrator to deploy the system plan from the old

system to the new?

Which of the following will allow the administrator to install the partitions in the shortest possible time?

An administrator needs to install AIX on 50 LPARs on a new Power 795. All partitions require the
same level of customization and the same version of AIX. For security reasons, NIM cannot be
used in this environment.

The new system has a single DVD RAM drive. A Single VIO partition has already been configured.
Which of the following will allow the administrator to install the partitions in the shortest possible
time?

Which action will allow the managed server and HMC to establish new RMC configurations?

A Power Systems server has two HMCs connected to its Flexible Service Processor (FSP). It is
decided to upgrade one of them to a later hardware version. The 7042-CR3 is disconnected and
the new 7042-CR6 is connected in its place. The new HMC successfully discovers the managed
server but some operations including DLPAR are failing.
Which action will allow the managed server and HMC to establish new RMC configurations?


Page 17 of 18« First...10...1415161718