if a scheduled client backup is missed, but other consecutive scheduled events for that node are completed, which two logs should be checked? (Choose two.)

A.
backup log
B.
DSM event log
C.
server activity log
D.
client schedule log
E.
server schedule log
Explanation:
I have the same idea. CD