Which solution will satisfy the requirements?
A large manufacturer wants to consolidate their existing AIX and Linux environments to POWER8.
The customer has four AIX servers and twelve Ubuntu servers.
Which solution will satisfy the requirements?
How can system software charges be reduced when migrating from POWER6 to a POWER8 Scale-out server?
How can system software charges be reduced when migrating from POWER6 to a POWER8
Scale-out server?
Which feature(s) would enable this function?
A customer needs faster response time from their database server and is considering purchasing
POWERS. They are familiar with Easy Tier, and have heard that they can use it locally on some
servers.
Which feature(s) would enable this function?
How many IBM i processor licenses are required to support this configuration?
A customer is ordering a 4-core S814 with the following partitions. The default processor pool will
be used.
An IBM i partition capped at 1.0 processors.
A second IBM i partition capped at 0.5 processors.
An AIX partition capped at 0.5 processors.
A Linux partition capped at 0 5 processors.
How many IBM i processor licenses are required to support this configuration?
Which of the following statements correctly describes a difference between the S814 and S824?
Which of the following statements correctly describes a difference between the S814 and S824?
What is the number of threads that can be processed for maximum throughput on a POWER8 core?
What is the number of threads that can be processed for maximum throughput on a POWER8
core?
Which of the following is the correct course of action at the least cost?
A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and
utilizing Power HA to a POWER6 2-core server as their backup machine.
The production machine also has unlimited users, IBM i Access users, SOL, and ILE Compilers.
They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i
and one licensed Power HA core.
The customer wants the backup server to have the same capacity as the production server so it
can be a true high availability server.
Which of the following is the correct course of action at the least cost?
what feature of POWER8 processor technology enables more efficient processor utilization in support of highly
As compared to POWER7/7+, what feature of POWER8 processor technology enables more
efficient processor utilization in support of highly threaded applications?
Which of the following is an advantage of a Power Systems solution over an x86 solution for then implementatio
A client is considering hardware platforms for their Hadoop implementation.
Which of the following is an advantage of a Power Systems solution over an x86 solution for then
implementation?
Which solution satisfies the customer’s requirements?
A customer will be consolidating a number of IBM i and AIX partitions from several older servers
onto an existing S824 These partitions are parts of various operating groups within the customer
and require connectivity to various private networks and network redundancy. The server utilizes
SAN Storage and dual VIO Server partitions.
Which solution satisfies the customer’s requirements?