What ASMI UserID can the customer use, when directed by IBM Support, to reset the forgotten passwords?
After upgrading their HMCs to the V7R720 release, a customer was planning to consolidate
HMCs by taking advantage of the raised limit for maximum managed LPARs. They have
found two POWER6 570s on which the password for both HMC and admin UserIDs has
been forgotten. What ASMI UserID can the customer use, when directed by IBM Support, to
reset the forgotten passwords?
Which of the following options will minimize the time that the passive node is unavailable?
A client is running a two node active/passive cluster on AIX 6.1 and needs to migrate AIX
versions while minimizing the time the cluster runs without a failover node available. They
plan to migrate the passive node, before moving the resources off the active node to migrate
it.Which of the following options will minimize the time that the passive node is unavailable?
hown on the summary screen?
A partition is running on a Power 770 using POWER7 mode and SMT4. The LPAR has 8.0
units of entitled capacity assigned, and has 10 virtual processors configured. If the customer
uses nmon to monitor processor activity, how many processors will be shown on the
summary screen?
what does ‘%client’ mean?
Which was the first release of IBM i to support Multipath I/O (MPIO) at the client LPAR level, when the same s
Which was the first release of IBM i to support Multipath I/O (MPIO) at the client LPAR level,
when the same storage is served from redundant VIO Servers?
Which of the following is a supported method of configuring the new HMC, in relation to the existing HMC?
A customer has a Power 770 and a Power 795 managed by a single HMC. The existing
HMC has two network connections. The first adapter is connected to the general company
network and uses a static IP address. The second adapter is connected to a network switch
which also has connections to the Flexible Service Processors (FSPs) of the managed
systems and acts as a DHCP server. It has been decided to add a second HMC for
resilience. Which of the following is a supported method of configuring the new HMC, in
relation to the existing HMC?
What is the most comprehensive source for this information?
A customer is upgrading a Power 595 to a Power 795 and wants to know the estimated
power usage of the upgraded system. What is the most comprehensive source for this
information?
Which of the following is required?
A customer is adding a second HMC to their two-enclosure Power 780 to provide
redundancy. Which of the following is required?
Which of the following is a supported configuration for consolidation?
A customer wants to consolidate 5 System p servers to a Power 780. Each of the 5 systems
run as a single LPAR. Three systems run applications which are certified by the vendor for
AIX 5.2 only. One system runs AIX 5.3, and the last one runs AIX 6.1. Which of the following
is a supported configuration for consolidation?
Which of the following options will support adding the new LPAR to the system with minimal impact to the exist
A system administrator would like to add a new LPAR to an existing Power 770 system that
currently hosts 4 other LPARs. The system has a total of 52 GB of RAM installed and is
licensed for Active Memory Expansion (AME). The current LPARs each have 12 GB of RAM
allocated to them, and are tolerant of varied response times. The new LPAR requires 8 GB
of RAM, and requires consistent response time. There is no money available to purchase
additional RAM. Which of the following options will support adding the new LPAR to the
system with minimal impact to the existing partitions?